Know what a part should cost, and whether it does what the datasheet says
Supplier negotiations rest on quotes and datasheets, and the supplier wrote both. We take the part apart, test it under your conditions, and build bill of materials (BOM) and cost analysis from what’s inside, so you negotiate, qualify, and switch on evidence.
Where sourcing teams bring us in
Usually before a negotiation, a qualification, or a switch.
When you’re negotiating price
A new contract, a renewal, or a cost-down target.
What’s at stake: negotiating against a supplier’s number with nothing to test it against.
What should this part or product cost to make?
A teardown to the component level, a BOM analysis, and a cost analysis with a should-cost model that shows every assumption. Teardown and competitive analysis · Teardown buyer’s guide
When you’re qualifying a part or a second source
A new supplier, a cheaper alternative, or a part you can no longer get.
What’s at stake: qualifying a part on its datasheet and finding the gap in the field.
Does it perform the way the datasheet says, under our conditions?
Independent testing against your specification and operating conditions, with a clear recommendation. Technical assessment
From our work: Li-ion cells in leading phones and laptops, tested for specs that weren’t published
Is the alternative really equivalent?
A side-by-side teardown and materials analysis of the incumbent and the candidate, down to structure and composition. Teardown and competitive analysis
From our work: smartphone touchscreens, structure and materials confirmed
When something changed and nobody told you
A new revision, a drift in quality, or a part that stopped behaving the same way.
What’s at stake: learning about a silent part change from your field returns.
What’s different between this revision and the last one?
A comparison of the two, from the board down to the components and materials, with what each difference means for your product. Teardown and competitive analysis · Technical assessment
From our work: how a range of LED devices are built
Planned backward from your negotiation or qualification date
From the question to the report.
- 1
Set the question
The part, the supplier, the decision, and the date it has to be made by.
Start here, with a call - 2
Get the samples
Your parts, a competitor’s, or bought on the open market, with where each came from documented.
- 3
Take it apart and test it
Our engineers do the work, with qualified partner facilities for the specialized steps.
- 4
Report
Findings your buyers and your engineers can both use, walked through with them.
A senior person replies within one business day. All inquiries are confidential.Urgent? Call (858) 367-3642
A part can bring a patent problem in with it
Where to check for intellectual property (IP) risk before you commit.
The technology workIts IP side
Second sources
When a cheaper part looks equivalent, we check it isn’t equivalent because it copies a patented design.
Supplier indemnities
A technical read of whether a part practices patents you’ve been warned about, so you know what the indemnity really has to cover.
Questions sourcing teams ask
Will the supplier know?
Not from us. We work under a nondisclosure agreement and don’t disclose who we’re working for.
Where do the samples come from?
From you, or bought on the open market. Either way, where each sample came from and how it was handled is documented.
How accurate is a should-cost model?
As accurate as its assumptions, which is why every one of them is shown. Your team can change a volume, a yield, or a component price and see the effect.
Tell us about the part and the decision
A senior person replies within one business day. All inquiries are confidential.